Webmail : Login
ONLINE RFID PASS
       
Berthing Facilities
S.No. Name of the Berth Type Max.Draught (Mts.) Quay Length (Mts.) Maximum DWT
1 V.O.C.Berth No.I Alongside 9.30 168 25,000
2 V.O.C.Berth No.II Alongside 9.30 168 40,000
3 V.O.C.Berth No.IIII Alongside 10.70 192 50,000
4 V.O.C.Berth No.IV Alongside 10.70 192 50,000
5 Berth No.V (A.B.1) Alongside 8.60 168 40,000
6 Berth No.VI (A.B.2) Alongside 9.30 168 40,000
7 Berth No.VII (PSA- SICAL Container Terminal) Alongside 10.90 370 50,000
8 Berth No.VIII (Dakshin Bharat Gateway Terminal) Alongside 13.00 345 80,000
9 Berth No.IX Alongside 13.00 335 80,000
10 Shallow Berth Alongside 5.85 140 5000
11 Oil jetty Jetty 13.00 229 65,000
12 Coal jetty-I Jetty 13.00 225 50,000
13 Coal jetty -II Jetty 13.00 225 60,000
14 North Cargo Berth -I Jetty 13.00 306 80,000
15 Zone- B Jetty for handling Sailing Vessels, Small Vessels and Barges Jetty 3.00 320 4,000
16 North Cargo Berth -II Jetty 13.00 306 80,000


Note
(6) Tankers of less than 150 M will not be berthed at Oil Jetty.
(5)(C) Distance between dolphins at extreme ends - 300m
(5)(C) Length of main jetty - 200m
(4)(B) Distance between dolphins at extreme ends - 300 m
(4)(B) Length of main jetty - 185m
(3)(A) Distance between mooring dolphins at extreme ends - 340m
(3)(A) Length of service Platform - 82m
(2)** Vessels drawing in excess of 10.70 shall be berthed at during high water only.
(1) Subject to availability of space. There should be at least 15m clearance from forward and after end of the vessel for berthing and unberthing.